Victoria indicators

← All measures

Buses running on time

Public, not open-licensedArea: Victoria Regional Transit April 1, 2026 to July 31, 2026 · Where this covers

72.4% of trips on time

Getting better

Was 70.5% in April to July 2025

Source: BC Transit, Apr 1, 2026 to Jul 31, 2026 · Full source

What it measures

The share of bus trips in the Victoria Regional Transit System that ran on time, for the period in BC Transit’s latest report to the regional Transit Commission.

Why it matters

Reliable buses make transit a practical choice for getting to work, school and appointments.

Over time

Line chart, 2 periods from Apr–Jul 2025 to Apr–Jul 2026. Buses running on time: starts at 70.5% of trips on time (Apr–Jul 2025), ends at 72.4% of trips on time (Apr–Jul 2026); highest 72.4% of trips on time (Apr–Jul 2026), lowest 70.5% of trips on time (Apr–Jul 2025). Every value is in the table.70.0%71.0%72.0%73.0%Apr–Jul 2025Apr–Jul 202670.5%72.4%Apr–Jul 2025: 70.5% of trips on timeApr–Jul 2026: 72.4% of trips on time

The scale starts at 70.0% (not zero), so the changes look larger than they would on a scale from zero. Tap, hover or drag along the chart to see each value.

How we decided “getting better”

A higher number means more buses ran on time. Less than 1 percentage point counts as about the same. 72.4% of trips were on time from April 1, 2026 to July 31, 2026, compared with 70.5% in the same months of 2025. The rules.

Source

Period
April 1, 2026 to July 31, 2026
Licence
Public data, not under an open licence. Used with attribution. Agency’s terms of use
Updated by agency
Several times a year (Transit Commission meetings); latest release not stated
Retrieved
Nov 11, 2026, 1:27 AM B.C. time

Source: BC Transit, Victoria Regional Transit System operations update. Public document, used with attribution; not endorsed by the publisher.

Text checked in the agency’s document

The script reads the agency’s own document each time and refuses to show a number unless this text is found.

  • On Time Performance (OTP): 72.4%
  • On-Time Performance April 1, 2026 to July 31, 2026
  • 72.4% 70.5% in April to July 2025 On Time Performance
Show the numbers as a table
Buses running on time, Victoria Regional Transit (newest first)
PeriodValue
Apr–Jul 202672.4%
Apr–Jul 202570.5%

Keep in mind

  • Read from a BC Transit presentation to the Victoria Regional Transit Commission; BC Transit defines “on time”.
  • Covers the whole regional transit system, not only routes in the City.
  • Only the period in the latest presentation is shown.

Where this covers

Area: Victoria Regional Transit

BC Transit’s Victoria Regional Transit System, which runs buses across most of the Capital Region.

Included

  • Bus routes in the Victoria Regional Transit System, from Sidney to Sooke, including the City of Victoria

Not included

  • Salt Spring Island and Gulf Islands transit, which are separate systems
  • No City-only figure is published

Official definition

How the agency describes it: Victoria Regional Transit System (Greater Victoria).

Connected to: BC Transit and the Victoria Regional Transit Commission, Road conditions and construction. This is a label, not a judgement.